1 00:00:08,880 --> 00:00:11,520 - [Narrator] Making roadways last longer is the goal 2 00:00:11,520 --> 00:00:13,530 of all pavement engineers. 3 00:00:13,530 --> 00:00:16,830 One of the keys to longer life rests in the binders 4 00:00:16,830 --> 00:00:19,140 which are added to pavement mixtures. 5 00:00:19,140 --> 00:00:21,660 Researchers with the Center for Transportation Research 6 00:00:21,660 --> 00:00:24,630 at the University of Texas are developing new test 7 00:00:24,630 --> 00:00:27,390 methods that can help them predict which binders 8 00:00:27,390 --> 00:00:29,760 will resist pavement distress, 9 00:00:29,760 --> 00:00:32,520 specifically rutting, fatigue cracking, 10 00:00:32,520 --> 00:00:33,780 and thermal cracking. 11 00:00:33,780 --> 00:00:38,000 - When you drive on asphalt roads, asphalt binder is quite 12 00:00:38,000 --> 00:00:42,600 literally the glue that's holding these roads together. 13 00:00:42,600 --> 00:00:46,020 It is also the most expensive material 14 00:00:46,020 --> 00:00:47,820 or component material that goes 15 00:00:47,820 --> 00:00:49,710 into production of asphalt mixtures 16 00:00:49,710 --> 00:00:51,960 and therefore the asphalt pavement. 17 00:00:51,960 --> 00:00:54,810 That inherent ability of the binder 18 00:00:54,810 --> 00:00:57,420 to resist cracking is what dictates the serviceable 19 00:00:57,420 --> 00:00:59,700 life of an asphalt pavement. 20 00:00:59,700 --> 00:01:03,510 - There has always been a need for tests or testing 21 00:01:03,510 --> 00:01:08,400 that can accurately detect ability of an asphalt binder to 22 00:01:08,400 --> 00:01:10,113 resist cracking in the field. 23 00:01:11,316 --> 00:01:14,190 This is even more important now as the binder industry 24 00:01:14,190 --> 00:01:17,160 or the binder manufacturers are developing new types 25 00:01:17,160 --> 00:01:21,480 of modifiers and chemicals to improve conditions of asphalt. 26 00:01:21,480 --> 00:01:23,910 - In the original research project 27 00:01:23,910 --> 00:01:27,684 we developed the poker chip test method 28 00:01:27,684 --> 00:01:31,990 and it showed some promise that it was able to detect 29 00:01:33,180 --> 00:01:35,610 whether or not an asphalt binder is susceptible 30 00:01:35,610 --> 00:01:37,590 to premature cracking or not. 31 00:01:37,590 --> 00:01:40,800 In the implementation study, we did two things. 32 00:01:40,800 --> 00:01:44,709 One was, we made the test very practical and easy to use 33 00:01:44,709 --> 00:01:48,210 by any technician in any asphalt laboratory. 34 00:01:48,210 --> 00:01:51,180 And the second thing we did was, we benchmarked the results 35 00:01:51,180 --> 00:01:53,760 from these tests, with the ground truth. 36 00:01:53,760 --> 00:01:56,520 We actually went down to 22 different sections all 37 00:01:56,520 --> 00:01:58,590 across the state, different climatic regions, 38 00:01:58,590 --> 00:02:02,520 traffic volumes, mixture types, pavement types, 39 00:02:02,520 --> 00:02:05,250 and benchmarked the parameters 40 00:02:05,250 --> 00:02:07,020 from this test with the ground truth. 41 00:02:07,020 --> 00:02:10,080 That is, if the test was telling that this pavement 42 00:02:10,080 --> 00:02:12,570 is likely to crack prematurely, 43 00:02:12,570 --> 00:02:13,950 whether or not it was cracking or not. 44 00:02:13,950 --> 00:02:16,650 And we established that connection 45 00:02:16,650 --> 00:02:20,220 between ground reality and what the test was telling us. 46 00:02:20,220 --> 00:02:22,411 - The main use for asphalt is hot mix. 47 00:02:22,411 --> 00:02:25,312 Asphalt mixture and asphalt binder 48 00:02:25,312 --> 00:02:26,640 is the most expensive part. 49 00:02:26,640 --> 00:02:30,123 We use about half a million ton of asphalt binder annually. 50 00:02:31,980 --> 00:02:34,440 We're really looking at any improvement. 51 00:02:34,440 --> 00:02:38,730 Quality of that material will have a really huge impact 52 00:02:38,730 --> 00:02:43,110 on the state in terms of savings, as well as in terms 53 00:02:43,110 --> 00:02:45,720 of having, you know, longer life pavements, 54 00:02:45,720 --> 00:02:48,330 getting more recycled material, as well 55 00:02:48,330 --> 00:02:52,270 as improving the quality of what's practically 56 00:02:53,422 --> 00:02:56,160 the driving cost of our hot mix. 57 00:02:56,160 --> 00:02:57,240 - [Narrator] For more information, 58 00:02:57,240 --> 00:02:59,760 and to find the publications for this project, 59 00:02:59,760 --> 00:03:02,670 please visit the Tex DOT research library 60 00:03:02,670 --> 00:03:04,173 at the link shown below.