1 00:00:00,172 --> 00:00:05,172 (suspenseful music) (screen whooshing) 2 00:00:06,120 --> 00:00:07,950 - [Narrator] Seal coats on roadways 3 00:00:07,950 --> 00:00:10,260 cost the Texas Department of Transportation 4 00:00:10,260 --> 00:00:13,020 over $250 million annually. 5 00:00:13,020 --> 00:00:16,170 Researchers with the Texas A&M Transportation Institute 6 00:00:16,170 --> 00:00:17,370 worked with TxDOT 7 00:00:17,370 --> 00:00:19,680 to develop guidelines for selecting projects 8 00:00:19,680 --> 00:00:21,600 with multiple seal coat layers 9 00:00:21,600 --> 00:00:23,790 for better performing pavement sections 10 00:00:23,790 --> 00:00:27,000 and to improve costs over the lifecycle of the coats. 11 00:00:27,000 --> 00:00:29,910 - So seal coats are preventive maintenance treatment 12 00:00:29,910 --> 00:00:33,180 that TxDOT tends to use about every seven years 13 00:00:33,180 --> 00:00:36,000 on roads that are structurally sound. 14 00:00:36,000 --> 00:00:39,510 And so over time on roads that are good, 15 00:00:39,510 --> 00:00:40,980 as you maintain them, 16 00:00:40,980 --> 00:00:44,040 you continue to add layers of seal coat. 17 00:00:44,040 --> 00:00:48,600 And we've seen some problems with shoving, 18 00:00:48,600 --> 00:00:50,130 in intersections, mainly, 19 00:00:50,130 --> 00:00:51,690 that's where you start to see it first, 20 00:00:51,690 --> 00:00:53,430 in curves, you'll see some shoving. 21 00:00:53,430 --> 00:00:54,840 And the question becomes, 22 00:00:54,840 --> 00:00:56,730 when does these multiple layers 23 00:00:56,730 --> 00:00:58,830 of seal coat become unstable, 24 00:00:58,830 --> 00:01:00,540 and how many layers can you have? 25 00:01:00,540 --> 00:01:03,150 - Yeah, so the key finding in this project is that 26 00:01:03,150 --> 00:01:06,390 we think that there is a maximum number of seal coats. 27 00:01:06,390 --> 00:01:09,060 It's not a magic number of three or four. 28 00:01:09,060 --> 00:01:11,430 There's a lot of factors that play into this 29 00:01:11,430 --> 00:01:13,230 based on traffic loading. 30 00:01:13,230 --> 00:01:14,790 And so what we determined 31 00:01:14,790 --> 00:01:17,280 was we were trying to find some testing 32 00:01:17,280 --> 00:01:19,470 that could help us determine 33 00:01:19,470 --> 00:01:21,150 when we're reaching that threshold. 34 00:01:21,150 --> 00:01:22,440 The contributing factor in this research 35 00:01:22,440 --> 00:01:24,060 was to help us identify 36 00:01:24,060 --> 00:01:27,460 what testing was available to narrow down 37 00:01:29,550 --> 00:01:30,960 that max number. 38 00:01:30,960 --> 00:01:32,410 - We did a 39 00:01:33,750 --> 00:01:35,700 visual inspection of the roadway. 40 00:01:35,700 --> 00:01:37,470 We did a video. 41 00:01:37,470 --> 00:01:40,770 We collected texture measurements. 42 00:01:40,770 --> 00:01:43,140 That's what we did in the field and in the lab. 43 00:01:43,140 --> 00:01:45,090 We actually made samples 44 00:01:45,090 --> 00:01:48,750 with multiple layers of seal coat with different materials, 45 00:01:48,750 --> 00:01:52,410 and then we tested those with different tests 46 00:01:52,410 --> 00:01:54,060 to look for stability. 47 00:01:54,060 --> 00:01:56,490 - The next step in this project is implementation. 48 00:01:56,490 --> 00:02:01,490 It would be using the tools developed in the research 49 00:02:02,340 --> 00:02:04,860 as a toolbox to determine 50 00:02:04,860 --> 00:02:06,420 when we're reaching that max level 51 00:02:06,420 --> 00:02:08,730 as accumulation of seal coats 52 00:02:08,730 --> 00:02:11,220 and what the next step should be, 53 00:02:11,220 --> 00:02:15,120 whether that is doing a seal coat, a rehab, or an overlay. 54 00:02:15,120 --> 00:02:17,970 - A lot of what we do when we build a seal coat, right, 55 00:02:17,970 --> 00:02:20,550 we're building a road in the weather. 56 00:02:20,550 --> 00:02:22,350 We're not manufacturing it, 57 00:02:22,350 --> 00:02:24,780 and so we don't have as tight of controls. 58 00:02:24,780 --> 00:02:28,080 So when you have to build something in the weather 59 00:02:28,080 --> 00:02:30,210 and under traffic in the roadway, 60 00:02:30,210 --> 00:02:32,730 there's always a risk 61 00:02:32,730 --> 00:02:35,670 of having a lot of things influence 62 00:02:35,670 --> 00:02:37,650 the quality of the construction. 63 00:02:37,650 --> 00:02:40,200 That's why we wanna look at the best practices 64 00:02:40,200 --> 00:02:44,430 on ways to mitigate or minimize these problems. 65 00:02:44,430 --> 00:02:45,630 - [Narrator] For more information 66 00:02:45,630 --> 00:02:48,060 and to find the publication for this project, 67 00:02:48,060 --> 00:02:50,370 please visit the TxDOT research library 68 00:02:50,370 --> 00:02:51,570 at the link shown below.