1 00:00:00,541 --> 00:00:03,124 (gentle music) 2 00:00:09,180 --> 00:00:11,310 - [Narrator] Closure joints are essential in the technique 3 00:00:11,310 --> 00:00:15,240 of accelerated bridge construction or ABCs. 4 00:00:15,240 --> 00:00:17,610 These structures require materials that cure 5 00:00:17,610 --> 00:00:19,320 and gain strength quickly 6 00:00:19,320 --> 00:00:22,500 while maintaining long-term durability. 7 00:00:22,500 --> 00:00:24,630 The Texas Department of Transportation 8 00:00:24,630 --> 00:00:27,090 and the Center for Transportation Research 9 00:00:27,090 --> 00:00:29,820 develop high performance mix designs 10 00:00:29,820 --> 00:00:31,110 with a focus on strength 11 00:00:31,110 --> 00:00:34,170 and durable closure joints that will speed up the time 12 00:00:34,170 --> 00:00:36,453 a structure can begin receiving traffic. 13 00:00:37,830 --> 00:00:39,840 - The way that Texas has been moving 14 00:00:39,840 --> 00:00:44,040 is we want construction done faster 15 00:00:44,040 --> 00:00:47,670 and road closures shortened 16 00:00:47,670 --> 00:00:51,180 to reduce the impact on the traveling public. 17 00:00:51,180 --> 00:00:54,960 - This research was driven by the need 18 00:00:54,960 --> 00:00:57,960 to be able to reconstruct bridges, 19 00:00:57,960 --> 00:01:00,660 especially in highly congested areas 20 00:01:00,660 --> 00:01:03,540 and what's called accelerated bridge construction 21 00:01:03,540 --> 00:01:06,480 or ABC projects. 22 00:01:06,480 --> 00:01:08,790 And the whole goal and the big picture 23 00:01:08,790 --> 00:01:12,390 is to be able to essentially come in over a weekend 24 00:01:12,390 --> 00:01:15,212 and replace a bridge 25 00:01:15,212 --> 00:01:20,212 by casting most of the bridge itself offsite, 26 00:01:20,880 --> 00:01:23,970 and then have it delivered over the weekend, 27 00:01:23,970 --> 00:01:27,204 right after the demolition of the superstructure, 28 00:01:27,204 --> 00:01:29,370 erect the entire bridge. 29 00:01:29,370 --> 00:01:30,450 And the goal would be to open 30 00:01:30,450 --> 00:01:33,480 that bridge back on Monday morning, for instance. 31 00:01:33,480 --> 00:01:36,660 - [Narrator] Creating the bridge off side 32 00:01:36,660 --> 00:01:40,170 and bringing those pieces on 33 00:01:40,170 --> 00:01:43,230 during construction can help speed up the process, 34 00:01:43,230 --> 00:01:48,230 by having the bridge partially built beforehand, 35 00:01:48,480 --> 00:01:50,700 construction time is reduced greatly. 36 00:01:50,700 --> 00:01:53,670 - [Speaker] And then our focus was primarily 37 00:01:53,670 --> 00:01:54,750 just the closure pores, 38 00:01:54,750 --> 00:01:58,920 which are basically six inch width sections 39 00:01:58,920 --> 00:02:02,010 of fiber reinforced concrete 40 00:02:02,010 --> 00:02:04,620 to essentially stitch the bridge together. 41 00:02:04,620 --> 00:02:07,740 - The most important finding from this research project 42 00:02:07,740 --> 00:02:12,150 has been the mixture type 43 00:02:12,150 --> 00:02:16,278 requested of what is called UHPC, 44 00:02:16,278 --> 00:02:18,240 which is ultra high performance concrete. 45 00:02:18,240 --> 00:02:21,840 And this type of concrete will cure faster, 46 00:02:21,840 --> 00:02:25,470 cure stronger than typical concrete. 47 00:02:25,470 --> 00:02:26,700 - Most important thing we found 48 00:02:26,700 --> 00:02:29,820 is that the technology is viable. 49 00:02:29,820 --> 00:02:32,580 We were able to demonstrate that in the lab, 50 00:02:32,580 --> 00:02:35,730 but more importantly, we demonstrated it by tracking 51 00:02:35,730 --> 00:02:38,280 and monitoring two different bridges 52 00:02:38,280 --> 00:02:40,470 that TxDOT was in the process 53 00:02:40,470 --> 00:02:42,720 of designing and constructing, 54 00:02:42,720 --> 00:02:45,840 and our team was involved in instrumentation, 55 00:02:45,840 --> 00:02:49,230 monitoring of those bridges 56 00:02:49,230 --> 00:02:51,240 over the course of a couple of years. 57 00:02:51,240 --> 00:02:54,090 - [Speaker] By monitoring bridges during use 58 00:02:54,090 --> 00:02:58,770 by normal traffic loading, we're able to see the stresses 59 00:02:58,770 --> 00:03:03,770 and forces that go into these joints 60 00:03:03,900 --> 00:03:08,010 and allow us to see how these joints are performing, 61 00:03:08,010 --> 00:03:12,060 whether they're getting over stress and cracking too much 62 00:03:12,060 --> 00:03:15,210 or if they're performing well during the stress 63 00:03:15,210 --> 00:03:17,253 of normal traffic. 64 00:03:18,090 --> 00:03:19,167 - [Narrator] For more information 65 00:03:19,167 --> 00:03:21,720 and to find the publication for this project, 66 00:03:21,720 --> 00:03:24,060 please visit the TxDOT Research Library 67 00:03:24,060 --> 00:03:25,260 at the link shown below.