1 00:00:00,000 --> 00:00:02,583 (bright music) 2 00:00:09,061 --> 00:00:09,894 (steam hissing) 3 00:00:09,894 --> 00:00:11,400 - [Narrator] The geothermal energy, 4 00:00:11,400 --> 00:00:13,140 heat coming from the earth, 5 00:00:13,140 --> 00:00:16,050 may be able to offer the Texas Department of Transportation 6 00:00:16,050 --> 00:00:18,456 another way to keep drivers safe. 7 00:00:18,456 --> 00:00:22,530 The University of Texas at Arlington is working with TxDOT 8 00:00:22,530 --> 00:00:25,320 to research the feasibility of this approach, 9 00:00:25,320 --> 00:00:27,990 as well as recommending types of heating systems 10 00:00:27,990 --> 00:00:31,533 and geothermal structures that can be used in the process. 11 00:00:33,199 --> 00:00:35,360 - We all experience in a day, 12 00:00:35,360 --> 00:00:39,660 we comes to the office relatively warm, like 70, 80s, 13 00:00:39,660 --> 00:00:41,940 and then we will leave our office in the evening, 14 00:00:41,940 --> 00:00:44,370 in the afternoon, it already drop below freezing. 15 00:00:44,370 --> 00:00:46,860 So the bridges is easy to ice, 16 00:00:46,860 --> 00:00:48,990 because there's no thermal insulation. 17 00:00:48,990 --> 00:00:52,350 So these iced bridges with the rest of the pavement 18 00:00:52,350 --> 00:00:53,700 is still free from ice, 19 00:00:53,700 --> 00:00:56,400 that causes a very dangerous situation. 20 00:00:56,400 --> 00:01:01,400 - So, we try to find a way how we can keep our bridges warm, 21 00:01:02,310 --> 00:01:05,970 that way ice and snow won't accumulate on it, 22 00:01:05,970 --> 00:01:09,693 and that way, keep the traveling public safe. 23 00:01:10,680 --> 00:01:13,890 - [Xinbao] We use the geothermal energy for bridge de-icing 24 00:01:13,890 --> 00:01:16,290 that we found is very effective. 25 00:01:16,290 --> 00:01:18,600 We test different variations, 26 00:01:18,600 --> 00:01:21,900 different versions, different scales. 27 00:01:21,900 --> 00:01:25,262 - [Elijah] UT Arlington built a bridge closer, 28 00:01:25,262 --> 00:01:28,530 on our right of way, closer to the railroad. 29 00:01:28,530 --> 00:01:31,500 They put some sensors and monitors on it 30 00:01:31,500 --> 00:01:34,623 and also the geothermal heating equipment on it, 31 00:01:35,490 --> 00:01:40,490 which kept the bridge warm during the cold weather. 32 00:01:42,060 --> 00:01:45,270 - We're using the closed plastic pipe, 33 00:01:45,270 --> 00:01:46,980 the pipe filled with water. 34 00:01:46,980 --> 00:01:50,040 One end of the pipe is inserted deeply into the ground. 35 00:01:50,040 --> 00:01:52,620 The other side, we put it underneath the bridge. 36 00:01:52,620 --> 00:01:57,150 So this waters inside the pipes is driven by water pump. 37 00:01:57,150 --> 00:01:58,680 So we turn the water pump on. 38 00:01:58,680 --> 00:02:01,230 The heat is being carried from the ground, 39 00:02:01,230 --> 00:02:05,280 from the ground to the bridge where the heat is needed. 40 00:02:05,280 --> 00:02:07,620 We investigated what kind of a working fluid, 41 00:02:07,620 --> 00:02:11,550 working media, considering different type of the bridge, 42 00:02:11,550 --> 00:02:13,800 different thickness with the bridge, 43 00:02:13,800 --> 00:02:17,250 how this technology gonna be implemented on the bridge. 44 00:02:17,250 --> 00:02:21,300 So we did laboratory scale. We do slab scale testing. 45 00:02:21,300 --> 00:02:23,790 We did in the simulated environment, 46 00:02:23,790 --> 00:02:27,960 also test the slab outside, outdoor environment 47 00:02:27,960 --> 00:02:30,810 after we collecting a lot of good data. 48 00:02:30,810 --> 00:02:34,530 The solution within this closed loop within the pipe 49 00:02:34,530 --> 00:02:37,950 is a mixture of glyco and water. 50 00:02:37,950 --> 00:02:41,055 It's very similar to where we put it in our windshield 51 00:02:41,055 --> 00:02:44,370 that can keep it from freezing. 52 00:02:44,370 --> 00:02:47,250 The major benefit of this research, 53 00:02:47,250 --> 00:02:49,770 this using geothermal for bridge de-icing 54 00:02:49,770 --> 00:02:53,250 of course is keep the bridge free from ice 55 00:02:53,250 --> 00:02:55,200 and snow during winter events, 56 00:02:55,200 --> 00:02:57,360 and also the associated other issues 57 00:02:57,360 --> 00:03:01,470 with using the traditional de-icers that have chemical, 58 00:03:01,470 --> 00:03:04,350 that can cause the environmental pollution, 59 00:03:04,350 --> 00:03:07,470 corrode the bridges, so there's also associated 60 00:03:07,470 --> 00:03:10,293 environmental benefits of using this technology. 61 00:03:11,190 --> 00:03:13,800 - Which are preventative measures 62 00:03:13,800 --> 00:03:17,130 over the icing on bridges rather than reactive, 63 00:03:17,130 --> 00:03:20,280 and this is one of the steps that we're going forward. 64 00:03:20,280 --> 00:03:21,450 - [Narrator] For more information 65 00:03:21,450 --> 00:03:23,850 and to find the publication for this project, 66 00:03:23,850 --> 00:03:26,190 please visit the TxDOT Research Library 67 00:03:26,190 --> 00:03:27,390 at the link shown below.