We are testing a new catalog system. Please try out our Presto catalog portal and let us know what you think!  
Sort by:

4 results
find (Location / Title / Author / CorporateAuthor / Responsibility / Place / Publisher / PubDate / Series / Descriptors / Abstract / Notes / TitleVariation / FormerTitle / StudyTitle / Sponsor / With / GeographicName / TOC / ReportNumber / SeeAlso / With ct Strategic Research Program & txdot*):

Click title for detailed information.

Seven TxDOT Strategic Research Briefs for FY 2011

1.

2012 ... Khali R. Persad [and nineteen others] This document contains seven research briefs developed for TxDOT's Strategic Research Program (SRP) in FY 2011, with a brief introduction summarizing the initiation of the SRP. CONTENTS: Project Summary Report: Development of a Strategic Research Program for TxDOT -- SRP

6661-RB [CTR] ... FHWA/TX-12/0-6661-RB

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_6661_rb.pdf
7.2 MB
______________________________________________________________________________________________________

Proposed TxDOT Strategic Research Program : Second Year Report

2.

2011 ... Khali R. Persad [and five others] In February 2010, The Texas Department of Transportation (TxDOT) contracted with the Center for Transportation Research (CTR) at The University of Texas at Austin, the Texas Transportation Institute (TTI), and The Center for Multidisciplinary Research in Transportation (TechMRT) at Texas

6661-2 [CTR] ... FHWA/TX-11/0-6661-2

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_6661_2.pdf
439 KB
______________________________________________________________________________________________________

TxDOT Strategic Research Program

3.

2011 ... RS: Khali R. Persad; Researchers: Randy Machemehl [and four others] The proposed Strategic Research Program (SRP) is intended to prepare the department for the transportation challenges likely to be faced in the next 10-30 years. It complements the current technical research program by addressing longer-term and

6661-s [CTR] ... PSR 0-6661 ... Project Summary Report, 0-6661

Full-text Link:
http://ftp.dot.state.tx.us/pub/txdot-info/rti/psr/6661.pdf
113 KB
______________________________________________________________________________________________________

Proposed TxDOT Strategic Research Program

4.

2011 ... Khali Persad [and five others] In late 2009, The Texas Department of Transportation (TxDOT) proposed the development of a Strategic Research Program (SRP) to prepare the department for the transportation challenges likely to be faced in the next 10-30 years. This report documents the results of the work conducted by

6661-1 [CTR] ... FHWA/TX-11/0-6661-1

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_6661_1.pdf
2.1 MB
______________________________________________________________________________________________________


Powered by Inmagic, Inc. (www.inmagic.com)