We have implemented a new catalog system. Please try out our Presto catalog portal and let us know what you think!  

Sort by:

50 results
find (Author =Persad Khali Ram 1956)
or (TOC ct khali persad / k.r. persad):

Click title for detailed information.

RTI Special Studies for TxDOT Administration in FY 2014

1.

2014 ... Khali Persad [and eighteen others] ∑ "Seven policy briefs were completed under [TxDOT Research Project 0-6581-CT,] Task 19, and were presented to TxDOT Administration and the new Executive Director. This report combines the policy briefs for easy reference. The seven policy briefs are presented individually in Volumes 1

6581-CT-7 [CTR] ... FHWA/TX-14 /0-6581-CT-7

Full-text Link:
http://library.ctr.utexas.edu/ctr-publications/0-6581-CT-7.pdf
11.1 MB
______________________________________________________________________________________________________

Small Business Inclusion: A Study of TxDOTís Consultant Procurement Program

2.

2013 ... Khali R. Persad [and four others] ∑ The Texas Department of Transportation (TxDOT) sought the services of a public institution of higher education to conduct a study of TxDOTís professional services contracting program through an Interagency Contract (IAC). The Request for Proposal (RFP) stated that it had come to

Persad 2013 [CTR] ... IAC 48-2XXIA001

Full-text Link:
http://library.ctr.utexas.edu/ctr-publications/iac/48-2XXIA001.pdf
2.6 MB
______________________________________________________________________________________________________

Assessment of TxDOT Staffing for Project Development and Construction, and Project Backlog Analysis

3.

2013 ... Khali R. Persad [and four others] ∑ The objective of the work documented in this report was to examine full-time-equivalent (FTE) staffing needs for TxDOT project development and construction, and analyze needs for backlogging projects, i.e., preparing construction plans in advance and keeping them at the ready for possible

6581-CT-5 [CTR] ... FHWA/TX-13/0-6581-CT-5

Full-text Link:
http://library.ctr.utexas.edu/ctr-publications/0-6581-CT-5.pdf
3.8 MB
______________________________________________________________________________________________________

RTI Special Studies for TxDOT Administration in FY 2012

4.

2013 ... Khali Persad [and four others] ∑ This research project was established by TxDOTís Research and Technology Implementation Office to address special studies required by the departmentís Administration during FY 2012. Three tasks were completed and are documented. ∑ CONTENTS: Chapter 1. Introduction -- Chapter 2.

6581-CT-4 [CTR] ... FHWA/TX-13/0-6581-CT-4

Full-text Link:
http://library.ctr.utexas.edu/ctr-publications/0-6581-CT-4.pdf
3.6 MB
______________________________________________________________________________________________________

Development of Guidelines for Operationally Effective Raised Medians and the Use of Alternative Movements on Urban Roadways

5.

2013 ... by Yi Qi [and seven others] ∑ The development of raised medians is an important access management technique commonly used in urban settings. It can be used to control or restrict mid-block left turns, U-turns or crossing maneuvers for implementing of alternative left-turn/U-turn movements. The objective of this research

6644-1 [TSU] ... FHWA/TX-13/0-6644-1

Full-text Link:
http://tti.tamu.edu/documents/0-6644-1.pdf
13.4 MB
______________________________________________________________________________________________________

0-6644, Development of Guidelines for Operationally Effective Raised Medians and the Use of Alternative Movements on Urban Roadways

6.

2013 ... Research Supervisor: Yi Qi; Researchers: Xiaoming Chen [and six others] ∑ "The development of raised medians is an important access management technique commonly used in urban settings. Currently, there are limited official guidelines available for practitioners in design and implementation of raised medians. In addition,

6644 PSR [TSU] ... 0-6644-S ... Project Summary Report

Full-text Link:
http://ftp.dot.state.tx.us/pub/txdot-info/rti/psr/0-6644-s_tsu.pdf
168 KB
______________________________________________________________________________________________________

Use of Flashing Yellow Operations to Improve Safety at Signals with Protected-Permissive Left Turn (PPLT) Operations

7.

2012 ... by Yi Qi [and six others] ∑ MUTCD 2009 Edition suggests the use of Flashing Yellow Arrow (FYA) indication in replacement of green ball indication for permissive left-turn signal in presence of separate signal heads. Currently, there is no clear guidance on how to implement flashing yellow operations with PPLT in Texas. The

6568-1 [TSU] ... FHWA/TX-09/0-6568-1

Full-text Link:
http://transportation.tsu.edu/Reports/TxDOT_0-6568-R1.pdf
4.5 MB
______________________________________________________________________________________________________

RTI Special Studies for TxDOT Administration in FY 2011

8.

2012 ... Khali R. Persad [and five others] ∑ This research project was established by TxDOTís Research and Technology Implementation Office to address special studies required by the departmentís Administration during FY 2011. Three short-term, quick-turnaround tasks were completed and are documented. The following three tasks

6581-CT-3 [CTR] ... FHWA/TX-11/0-6581-CT-3

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_6581_CT_3.pdf
2.1 MB
______________________________________________________________________________________________________

Seven TxDOT Strategic Research Briefs for FY 2011

9.

2012 ... Khali R. Persad [and nineteen others] ∑ This document contains seven research briefs developed for TxDOT's Strategic Research Program (SRP) in FY 2011, with a brief introduction summarizing the initiation of the SRP. ∑ CONTENTS: Project Summary Report: Development of a Strategic Research Program for TxDOT -- SRP

6661-RB [CTR] ... FHWA/TX-12/0-6661-RB

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_6661_rb.pdf
7.2 MB
______________________________________________________________________________________________________

Proposed TxDOT Strategic Research Program : Second Year Report

10.

2011 ... Khali R. Persad [and five others] ∑ In February 2010, The Texas Department of Transportation (TxDOT) contracted with the Center for Transportation Research (CTR) at The University of Texas at Austin, the Texas Transportation Institute (TTI), and The Center for Multidisciplinary Research in Transportation (TechMRT) at Texas

6661-2 [CTR] ... FHWA/TX-11/0-6661-2

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_6661_2.pdf
439 KB
______________________________________________________________________________________________________

Use of Flashing Yellow Operations to Improve Safety at Signals with Protected-Permissive Left Turn (PPLT) Operations

11.

2011 ... RS: Yi Qi; Researchers: Xiaoming Chen [and four others] ∑ The 2009 edition of the federal MUTCD suggests the use of the flashing yellow arrow (FYA) indication in lieu of the green ball indication for permissive left-turn signals in the presence of separate signal heads. Currently, there are no clear guidelines on how to implement

6568-PSR [TSU] ... PSR 0-6568-S ... Project Summary Report, 0-6568

Full-text Link:
http://ftp.dot.state.tx.us/pub/txdot-info/rti/psr/6568.pdf
52 KB
______________________________________________________________________________________________________

TxDOT Strategic Research Program

12.

2011 ... RS: Khali R. Persad; Researchers: Randy Machemehl [and four others] ∑ The proposed Strategic Research Program (SRP) is intended to prepare the department for the transportation challenges likely to be faced in the next 10-30 years. It complements the current technical research program by addressing longer-term and

6661-s [CTR] ... PSR 0-6661 ... Project Summary Report, 0-6661

Full-text Link:
http://ftp.dot.state.tx.us/pub/txdot-info/rti/psr/6661.pdf
113 KB
______________________________________________________________________________________________________

Proposed TxDOT Strategic Research Program

13.

2011 ... Khali Persad [and five others] ∑ In late 2009, The Texas Department of Transportation (TxDOT) proposed the development of a Strategic Research Program (SRP) to prepare the department for the transportation challenges likely to be faced in the next 10-30 years. This report documents the results of the work conducted by

6661-1 [CTR] ... FHWA/TX-11/0-6661-1

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_6661_1.pdf
2.1 MB
______________________________________________________________________________________________________

RTI Special Studies for TxDOT Administration in FY 2010

14.

2011 ... Khali R. Persad [and twelve others] ∑ This research project was established by the Texas Department of Transportationís (TxDOT) Research and Technology Implementation Office (RTI) in Fiscal Year 2009 and renewed in FY 2010 to evaluate transportation issues as requested by TxDOTís Administration, and develop findings and/or

6581-CT-2 [CTR] ... FHWA/TX-11/0-6581-CT-2

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_6581_CT_2.pdf
4.6 MB
______________________________________________________________________________________________________

It's About Time : Investing in Transportation to Keep Texas Economically Competitive. Appendices

15.

2011 ... Texas 2030 Committee [and others] ∑ ∑ CONTENTS: APPENDIX A : PAVEMENT QUALITY (Zhanmin Zhang, Michael R. Murphy, Robert Harrison), 7 pages -- APPENDIX B : BRIDGE QUALITY (Jose Weissmann, Angela J. Weissmann), 6 pages -- APPENDIX C : URBAN TRAFFIC CONGESTION (Tim Lomax, David Schrank), 32 pages --

6666-TTI-1 Appendices ... 0-6666-TTI-1 App.

Full-text Link:
http://texas2030committee.tamu.edu/documents/final_03-2011_appendices.pdf
14.1 MB
______________________________________________________________________________________________________

Economic Impacts of ARRA Stimulus Funding on TxDOT Projects

16.

2011 ... RS: Robert Harrison; Researchers: Ateeth Dhumal and Khali R. Persad ∑ In February 2009, Congress passed the American Recovery and Reinvestment Act (ARRA) with the goal of stimulating employment. The Texas Department of Transportation (TxDOT) received $2.25 billion of the $26 billion that was allocated to transportation

6592-PSR [CTR] ... PSR 0-6592-S ... Project Summary Report, 0-6592

Full-text Link:
http://ftp.dot.state.tx.us/pub/txdot-info/rti/psr/6592.pdf

______________________________________________________________________________________________________

Implementation of Database for TxDOT ARRA Projects

17.

2010 ... Khali R. Persad, Jasjyot S. Suri ∑ The American Recovery and Reinvestment Act of 2009 (ARRA) was a fiscal stimulus package signed by President Obama on March 6, 2009. State agencies like the Texas Department of Transportation (TxDOT) who received ARRA funds had to report, on a monthly basis, various data on each project in

6592-01-1 [CTR] ... FHWA/TX-11/5-6592-01-1

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/5_6592_01_1.pdf
529 KB
______________________________________________________________________________________________________

Employment Impacts of ARRA Funding on TxDOT Projects

18.

2010 ... Rob Harrison, Khali R. Persad, and Ateeth Dhumal ∑ The stimulus package signed by President Obama on March 6, 2009 is known as the American Recovery and Reinvestment Act (ARRA). This act allocated $48.1 billion to transportation of which $27.5 billion was for highway projects. Texas was allotted the second highest distribution

6592-1 [CTR] ... FHWA/TX-11/0-6592-1

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_6592_1.pdf
2.5 MB
______________________________________________________________________________________________________

Toll Roads : What We Know About Forecasting Usage and the Characteristics of Texas Users

19.

2010 ... Jolanda Prozzi [and nine others] ∑ Inadequate funding from fuel taxes, increased demand for transportation, and increased maintenance needs due to an aging highway system, have resulted in significant deficits along with renewed interest in toll road development, both to finance new roads or add capacity to existing

6044-P1 [CTR] ... Product 0-6044-P1

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_6044_P1.pdf
874 KB
______________________________________________________________________________________________________

Financing Tools and Partnerships for Rural and Semi-urban Transportation Projects

20.

2009 ... Dr. Khali Persad, Dr. C. Michael Walton and Patricia Franco ∑ In this research product, financing techniques and partnerships for rural and small urban area transportation projects are presented. This research examined alternative financing options, TxDOT experience with them, and lessons learned. The results will be of use

6034-P1/P2 [CTR] ... Product 0-6034-P1; Product 0-6034-P2

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_6034_P1.pdf
1.4 MB; P1 is equivalent to P2
______________________________________________________________________________________________________

Evaluation of TxDOT's J.A.C.K. Model for Revenue and Expenditure Projections

21.

2009 ... Khali R. Persad [and six others] ∑ This research report documents work conducted by the Center for Transportation (CTR) at The University of Texas at Austin in analyzing the Joint Analysis using the Combined Knowledge (J.A.C.K.) program. This program was developed by the Texas Department of Transportation (TxDOT)

6395-CT-1 [CTR] ... FHWA/TX-09/0-6395-CT-1

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_6395_CT_1.pdf
2.6 MB
______________________________________________________________________________________________________

Communications Materials on Methods of Development of Revenue and Cost Estimates to Non-Technical Audiences

22.

2009 ... Khali Persad [and six others] ∑ This CDROM includes PDFs of presentations on the following topics: "TXDOT Revenue and Expenditure Trends;" "Examine Highway Fund Diversions, & Benchmark Texas Vehicle Registration Fees;" "Evaluation of the JACK Model;" "Future highway construction cost trends;" "Fuel Efficiency

6395-CT-P2 [CTR] ... Product 0-6395-CT-P2

Full-text Link:
Online resource not available.
______________________________________________________________________________________________________

Estimated and Actual Usage of Toll Facilities

23.

2009 ... C. Michael Walton [and nine others] ∑ As toll road development increases to finance new or add capacity to existing road infrastructure, reliable traffic and revenue (T&R) forecasts informed by a robust understanding of who uses and who does not use toll roads becomes increasingly important to toll road developers, financiers, T&R

6044 [CTR] ... PSR 0-6044 ... Project Summary Report, 0-6044

Full-text Link:
http://ftp.dot.state.tx.us/pub/txdot-info/rti/psr/6044.pdf

______________________________________________________________________________________________________

Special Studies for TxDOT Administration in FY 2009

24.

2009 ... Khali Persad [and six others] ∑ This research project was established by TxDOT's Research and Technology Implementation Office to address special studies required by the department's Administration during FY 2009. Five short-term, quick turnaround tasks were completed and are documented. ∑ Project performed in

6581-CT-1 [CTR] ... FHWA/TX-10/0-6581-CT-1

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_6581_CT_1.pdf
5.4 MB
______________________________________________________________________________________________________

Arterial Intelligent Transportation Systems : Infrastructure Elements and Traveler Information Requirements

25.

2009 ... C. Michael Walton [and five others] ∑ Applying Intelligent Transportation Systems (ITS) to arterial systems allows TxDOT to significantly enhance transportation system operation efficiency and improve traffic mobility. However, no guidelines are available to assist TxDOT staff in selecting the most beneficial arterial ITS

5865 [CTR] ... PSR 0-5865 ... Project Summary Report, 0-5865

Full-text Link:
http://ftp.dot.state.tx.us/pub/txdot-info/rti/psr/5865.pdf

______________________________________________________________________________________________________

Arterial Intelligent Transportation Systems : Infrastructure Elements and Traveler Information Requirements

26.

2009 ... Michael C. Walton [and five others] ∑ Applying Intelligent Transportation Systems (ITS) to arterial systems allows TxDOT to significantly enhance transportation system operation efficiency and improve traffic mobility. However, no guidelines are available to assist TxDOT staff in selecting the most beneficial arterial ITS

5865-1 [CTR] ... FHWA/TX-10/0-5865-1

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_5865_1.pdf
1.8 MB
______________________________________________________________________________________________________

Financing Tools for Rural and Small Urban Area Projects

27.

2009 ... Khali R. Persad, C. Michael Walton, Patricia Franco ∑ This research examined financing tools that are applicable to rural and small urban area projects undertaken by the Texas Department of Transportation. It documents district experience with some of these tools and lessons learned. Pass-Through Tolling Agreements

6034-1/P1/P2 [CTR] ... FHWA/TX-09/0-6034-1; Product 0-6034-P1; Product 0-6034-P2

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_6034_1.pdf
http://www.utexas.edu/research/ctr/pdf_reports/0_6034_P1.pdf
11.5 MB, 1.4 MB
______________________________________________________________________________________________________

In-Depth Analysis of the JACK Model

28.

2009 ... Khali R. Persad [and six others] ∑ Recently, as part of a comprehensive analysis of budget and funding options, a TxDOT special task force has examined the agency's current financial forecasting methods and has developed a model designed to estimate future State Highway Fund revenues and expenditures. The Joint Analysis

6395-P3 [CTR] ... Product 0-6395-P3

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_6395_P3.pdf
3.7 MB
______________________________________________________________________________________________________

Estimated vs. Forecasted Toll Usage : A Case Study Review

29.

2008 ... C. Michael Walton [and six others] ∑ Reliable T&R forecasts are critical to the success of toll proposals. However, a number of studies by the bond rating agencies?specifically Standard & Poor?s (S&P)?have shown that a majority of toll roads failed to meet revenue expectations in their first full year of operation. These studies alluded

6044-1 [CTR] ... FHWA/TX-10/0-6044-1

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_6044_1.pdf
2.5 MB
______________________________________________________________________________________________________

Planning and Financing Tools for Rural Small Urban Area Projects

30.

2008 ... RS: C. Michael Walton; Researchers: Patricia Franco and Khali R. Persad ∑ This research addresses the unique financing and planning needs of rural and small urban areas (RSUA) of Texas. It will aid these areas in determining the financing and planning tools appropriate to each type of transportation project and the

6034 [CTR] ... PSR 0-6034 ... Project Summary Report, 0-6034

Full-text Link:
http://ftp.dot.state.tx.us/pub/txdot-info/rti/psr/6034.pdf

______________________________________________________________________________________________________

Electronic Vehicle Identification : Applications and Implementation Considerations

31.

2007 ... Khali Persad [and four others] ∑ Electronic vehicle identification (EVI) is already an important component of electronic toll collection. Universal EVI would provide the opportunity for transportation agencies to introduce ITS features such as in-vehicle information systems. In this project three areas were researched: (1) Current and

5217-1 [CTR] ... 0-5217-1

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_5217_1.pdf
2.2 MB
______________________________________________________________________________________________________

Vehicle/License Plate Identification for Toll Collection Applications

32.

2007 ... RS: Michael Walton; Researchers: Shahriyar Hussain [and three others] ∑ Electronic toll collection (ETC), specifically open road tolling (ORT), is quickly becoming preferred practice among toll authorities in the U.S. and internationally. ORT technology has proven to be the most successful segment of Intelligent Transportation Systems

5217-s [CTR] ... PSR 0-5217 ... Project Summary Report, 0-5217

Full-text Link:
http://ftp.dot.state.tx.us/pub/txdot-info/rti/psr/5217.pdf

______________________________________________________________________________________________________

Toll Collection Technology and Best Practices

33.

2007 ... Khali Persad, C. Michael Walton and Shahriyar Hussain ∑ In this research product, tolling practices and technologies are presented. Likely developments and enhancements are reviewed, along with potential tie-ins to other Intelligent Transportation Systems (ITS) deployments. Ultimately, this research project will develop

5217-P1 [CTR] ... Product 0-5217-P1

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_5217_P1.pdf
1.7 MB
______________________________________________________________________________________________________

Electronic Vehicle Identification : Industry Standards, Performance, and Privacy Issues

34.

2007 ... Khali Persad, C. Michael Walton and Shahriyar Hussain ∑ In this research product, industry standards for dedicated short range communications (DSRC) are reviewed, followed by an evaluation of costs and performance. Privacy concerns regarding collection and use of data on vehicle movements are examined in the context of

5217-P2 [CTR] ... Product 0-5217-P2

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_5217_P2.pdf
752 KB
______________________________________________________________________________________________________

Best Practices in Right-of-Way Valuations and Negotiations Report

35.

2007 ... Carlos H. Caldas [and five others] ∑ Right-of-way acquisition is an integral component of the overall planning and implementation of highway and transportation projects. This process has become more complex, expensive, time consuming, and socially sensitive over the last few decades. For this reason, the valuations of the

5379-1 [CTR] ... 0-5379-1

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_5379_1.pdf
2.3 MB
______________________________________________________________________________________________________

Implementation Issues and Strategies for Deployment of Traveler Information Systems in Texas

36.

2007 ... Khali Persad, C. Michael Walton and Zhong Wang ∑ This research product provides in-depth analysis of the benefits and costs of Advanced Traveler Information Systems (ATIS) deployment to enhance toll road operations in Texas, the implementation issues of ATIS, and funding opportunities for ATIS implementations. A case

5079-P3 [CTR] ... Product 0-5079-P3

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_5079_P3.pdf
460 KB
______________________________________________________________________________________________________

Guidelines for Best Practices in Toll Development Agreements

37.

2006 ... Khali Persad, C. Michael Waltonn and Julie Wilke ∑ This research product presents a synthesis of best practices in toll project development agreements to minimize the impact of traffic competition between tolled and non-tolled facilities and thus reduce the need for a noncompete clause. These practices are extracted from 20 case

5020-P1 [CTR] ... Product 0-5020-P1

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_5020_P1.pdf
96 KB
______________________________________________________________________________________________________

Alternatives to Non-Compete Clauses in Toll Development

38.

2006 ... Khali Persad, C. Michael Walton and Julie Wilke ∑ This research product is a brochure summarizing best practices in toll project development agreements that may minimize the impact of traffic competition between tolled and non-tolled facilities, and thus reduce the need for a non-compete clause. These practices are extracted from 20

5020-P2 [CTR] ... Product 0-5020-P2

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_5020_P2.pdf
170 KB
______________________________________________________________________________________________________

Use of Traveler Information to Improve Texas Transportation Network Operations in the Context of Toll Roads

39.

2006 ... C. Michael Walton, Khali Persad and Zhong Wang ∑ To repay bond debt for new toll roads, investors will depend on toll revenue, an uncertain source. Studies have found that traffic on toll roads is initially low, and grows slowly over time as motorists become aware of the time savings and other benefits of a toll road. Given this

5079-1 [CTR] ... 0-5079-1

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_5079_1.pdf
1.2 MB
______________________________________________________________________________________________________

Synthesis of Best Practices in Right-of-Way Valuations and Negotiations

40.

2006 ... Carlos H. Caldas [and five others] ∑ Right-of-way (R/W) acquisition is an integral component of the overall planning and implementation of highway and transportation projects. This process has become more complex, expensive, time consuming and socially sensitive over the last few decades. The valuation of the parcels

5379-P1 [CTR] ... Product 0-5379-P1

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_5379_P1.pdf
490 KB
______________________________________________________________________________________________________

Impacts of Traveler Information on Transportation Network Operations and Potential Deployment Technologies

41.

2006 ... Khali Persad, C. Michael Walton and Zhong Wang ∑ This research product provides in-depth analysis of the impact of traveler information on commutersí route choices in the toll road context. The details of a case study of the Austin, Texas metropolitan area are presented, showing impacts on the non-tolled network as well as on

5079-P2 [CTR] ... Product 0-5079-P2

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_5079_P2.pdf
1.3 MB
______________________________________________________________________________________________________

Use of Traveler Information to Enhance Toll Road Operations

42.

2006 ... RS: C. Michael Walton; Researchers: Khali Persad and Zhong Wang ∑ Supporting the development of toll roads allows the Texas Department of Transportation (TxDOT) to add capacity and relieve congestion more quickly. However, traffic diversion to toll roads is often less than projected, impacting both toll revenues and system

5079-S [CTR] ... PSR 0-5079-S ... Project Summary Report, 0-5079

Full-text Link:
http://ftp.dot.state.tx.us/pub/txdot-info/rti/psr/5079.pdf

______________________________________________________________________________________________________

Best Practices in Right-of-Way Valuations and Negotiations

43.

2006 ... RS: Carlos H. Caldas; Researchers: Eugene J. Chung [and four others] ∑ Right-of-way acquisition is an integral component of the overall planning and implementation of highway and transportation projects. This process has become more complex, expensive, time-consuming, and socially sensitive over the last few decades. The

5379-S [CTR] ... PSR 0-5379-S ... Project Summary Report, 0-5379

Full-text Link:
http://ftp.dot.state.tx.us/pub/txdot-info/rti/psr/5379.pdf

______________________________________________________________________________________________________

Effectiveness of Combined Utility Relocation/Highway Construction Projects

44.

2006 ... RS: James T. OíConnor; Researchers: Carlos Caldas, Khali Persad ∑ With highway projects frequently located in congested, interference-prone environments, timely utility adjustments are more critical than ever. The aim of this research was to investigate the effective implementation of a utility adjustment approach that puts utility

4997-S [CTR] ... PSR 0-4997-S ... Project Summary Report, 0-4997

Full-text Link:
http://ftp.dot.state.tx.us/pub/txdot-info/rti/psr/4997.pdf

______________________________________________________________________________________________________

Operational and Safety Impacts When Retrofitting Bicycle Lanes

45.

2006 ... RS: Randy Machemehl; Researchers: David Luskin, Khali Persad, Ian Hallett, and Jeff Gjertsen ∑ A bicycle facility Ė a bike lane or a wide outside lane Ė added to an existing roadway without changing the curb-to-curb width is often referred to as a "retrofit." These facilities have become increasingly common in urban

5157-S [CTR] ... PSR 0-5157-S ... Project Summary Report, 0-5157

Full-text Link:
http://ftp.dot.state.tx.us/pub/txdot-info/rti/psr/5157.pdf

______________________________________________________________________________________________________

Alternatives to Non-Compete Clauses in Toll Development Agreements

46.

2005 ... Khali R. Persad, C. Michael Walton and Julie Wilke ∑ Private investors in toll roads sometimes request restrictive covenants such as non-compete clauses, which could prevent the public sector from adding capacity in the region for the life of the toll agreement. This research project examined 20 case studies of toll agreements in

5020-1 [CTR] ... 0-5020-1

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_5020_1.pdf
1.4 MB
______________________________________________________________________________________________________

Trans-Texas Corridor Right-of-Way Royalty Payment Feasibility : A Summary

47.

2005 ... Khali R. Persad [and four others] ∑ ∑ Publ. by: University of Texas at Austin. Center for Transportation Research (CTR).

4808-S [CTR] ... PSR 0-4808-S ... Project Summary Report, 0-4808

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_4808_S.pdf

______________________________________________________________________________________________________

Trans-Texas Corridor Right-of-Way Royalty Payment Feasibility

48.

2003 ... Khali R. Persad [and four others] ∑ The Trans-Texas Corridor is a proposed new tolled multimodal transportation system 4,000 miles long across Texas. The 1,200-feet-wide right-of-way (ROW) required is significantly more than that for previous transportation projects. Recent legislation (HB 3588) permits the Texas

4808-1 [CTR] ... 0-4808-1

Full-text Link:
http://www.utexas.edu/research/ctr/pdf_reports/0_4808_1.pdf
1.8 MB
______________________________________________________________________________________________________

Proposed Ramp Location Strategies : A Manual to Improve Frontage Road Traffic Flow through the Planning and Coordination of Ramp Locations with Anticipated Future Land Development

49.

2001 ... Maria Burke and Khali Persad ∑ This document provides guidelines to support the recommendations and implementation proposals advanced in TxDOT report 0-1762, Evaluation of the Effects of Ramp Location on Land Use and Development. Case studies reviewing sites throughout the State of Texas contributed the findings and

1762 [TSU] ... Report 5-1762

Full-text Link:
No online resource supplied by publisher
______________________________________________________________________________________________________

Pre-Construction Managment System : Procedures Manual

50.

1990 ... Khali Persad, James T. O'Connor, frederick Hugo ∑ The Pre-construction Management System is a system to aid managers in planning and controlling schedules and manpower requirements for the Design phase of highway projects. The major objectives of this development include the following: (1) to provide projections of the

922-1 [CTR] ... Report 7-922-1F

Full-text Link:
http://library.ctr.utexas.edu/digitized/texasarchive/phase2/922-1f.pdf
2.05 MB
______________________________________________________________________________________________________



Cockrell School of Engineering | The University of Texas at Austin | Web Accessibility Policy | Web Privacy Policy


Powered by Inmagic, Inc. (www.inmagic.com)