We have implemented a new catalog system. Please try out our Presto catalog portal and let us know what you think!  

Sort by:
New Search

25 results
find (Author =Khwaja Nabeel)
or (TOC ct nabeel khwaja / n khwaja):
Click title for detailed information.
Civil Integrated Management (CIM) for Departments of Transportation. Volume 2, Research Report
1.
2016 ... William J. O'Brien [and eight others] · "This report presents guidance for state departments of transportation (DOTs) and other agencies for adopting and applying practices and tools entailing collection, organization, and management of information in digital formats about a highway or other transportation
NCHRP Report 831 ... Report (National Cooperative Highway Research Program - NCHRP), 831
Full-text Link:
https://www.nap.edu/catalog/23690/
Free download options
______________________________________________________________________________________________________
Civil Integrated Management (CIM) for Departments of Transportation. Volume 1, Guidebook
2.
2016 ... William J. O'Brien [and eight others] · "This report presents guidance for state departments of transportation (DOTs) and other agencies for adopting and applying practices and tools entailing collection, organization, and management of information in digital formats about a highway or other transportation
NCHRP Report 831 ... Report (National Cooperative Highway Research Program - NCHRP), 831
Full-text Link:
https://www.nap.edu/catalog/23697/
Free download options
______________________________________________________________________________________________________
Research and Education
3.
2016 ... [various authors] · "This issue contains seven papers concerned with research and education. Specific topics included in this issue include the following: university best practices in technology transfer; a historical contest to create play space for children; negotiation of a financial package for freeways; asynchronous online training;
TRR 2552 ... Transportation Research Record (TRR), 2552
Full-text Link:
Ask librarian for assistance.
______________________________________________________________________________________________________
Visualization for the North Tarrant Express 35W Project
4.
[2016] ... by Cameron Schmeits and Nabeel Khwaja · This poster shows how 3D and 4D modeling has assisted TxDOT in a variety of ways during construction of the $1.4 billion North Tarrant Express 35W project. · Presented at the 2016 CTR Symposium, April 13, 2016, Austin, Texas · Publ. by: [Produced by researcher].
Poster 2016 CTR Symp: Schmeits
Full-text Link:
No online resource supplied by researcher
______________________________________________________________________________________________________
Decision Support System for Selection of Project Delivery Method
5.
[2016] ... by Mayra S. Martinez [and three others] · Alternative Project Delivery methods (PDMs) have been adopted by several public and private agencies since the past few decades. Availability of multiple options for PDMs necessitates development of formal decision support systems to determine the appropriate choice. This study
Poster 2016 CTR Symp: Martinez
Full-text Link:
No online resource supplied by researcher
______________________________________________________________________________________________________
Strategies for a Comprehensive Inventory and Management of Real Property Assets : White Paper
6.
2015 ... William O’Brien, Zhanmin Zhang, Nabeel Khwaja · The Texas Department of Transportation (TxDOT) manages a significant amount of right-of-way (ROW) assets—around 1.1 million acres of land that provide ROW for nearly 80,000 centerline miles. Management of these ROW assets is crucial, as ROW issues often create a
6827-WP1 [CTR] ... FHWA/TX-16/0-6827-WP1
Full-text Link:
http://library.ctr.utexas.edu/ctr-publications/0-6827-wp1.pdf
638 KB
______________________________________________________________________________________________________
Communicating Complex Construction and Traffic Control to the Public
7.
[2015] ... Nabeel Khwaja, P.E., Cameron Schmeits · The FM 407 cross street along IH-35E was planned to be reconstructed approximately 10 years ago. Due to funding issues and other circumstances, construction of this small portion of the IH-35E highway was delayed and eventually combined with the 35 Express Project. FM 407 is
Poster 2015 CTR Symp: Khwaja Construction
Full-text Link:
http://library.ctr.utexas.edu/symposium/poster-session/2015/CommunicatingtothePublic.pdf
4.6 MB
______________________________________________________________________________________________________
Addressing Concerns of the LBJ Express Depressed Managed Lanes : Signage and Sunlight Analysis
8.
[2015] ... Nabeel Khwaja, P.E., Cameron Schmeits · The LBJ Express project has several miles of managed toll lanes that are depressed and partially covered by the free highway lanes above. The amount the managed lanes are covered varies along the length of the project depending on how much right of way was available. Also, to
Poster 2015 CTR Symp: Khwaja Sunlight
Full-text Link:
http://library.ctr.utexas.edu/symposium/poster-session/2015/Concerns-LBJexpressSignage.pdf
2.4 MB
______________________________________________________________________________________________________
Visualization Technology for TxDOT Design and Construction Projects : the LBJ Express Project in Dallas, Texas
9.
[2014] ... Nabeel Khwaja [and five others] · 3D/4D modeling has been adopted for use in the building construction industry relatively quickly, however, its use in highway construction has been limited at best. The Center for Transportation Research has been using 3D/4D modeling on several TxDOT projects in the Design and
Poster 2014 CTR Symp: Khwaja Visualization LBJ
Full-text Link:
No online resource supplied by researcher
______________________________________________________________________________________________________
Visualization Technology for TxDOT Design and Construction Projects : the North Tarrant Express Project in Tarrant County, Texas
10.
[2014] ... Nabeel Khwaja [and six others] · 3D/4D modeling has been adopted for use in the building construction industry relatively quickly, however, its use in highway construction has been limited at best. The Center for Transportation Research has been using 3D/4D modeling on several TxDOT projects in the Design and Construction
Poster 2014 CTR Symp: Khwaja Visualization Tarrant
Full-text Link:
No online resource supplied by researcher
______________________________________________________________________________________________________
Visualization Technology for TxDOT Design and Construction Projects : the Horseshoe Project in Dallas, Texas
11.
[2014] ... Nabeel Khwaja [and six others] · 3D/4D modeling has been adopted for use in the building construction industry relatively quickly, however, its use in highway construction has been limited at best. The Center for Transportation Research has been using 3D/4D modeling on several TxDOT projects in the Design and Construction
Poster 2014 CTR Symp: Khwaja Visualization Horseshoe
Full-text Link:
No online resource supplied by researcher
______________________________________________________________________________________________________
Mobility Planning for the Dallas Horseshoe Project Procurement
12.
[2014] ... Nabeel Khwaja, Kristopher Pruner · The $800 million Dallas Horseshoe Project consists of reconstructing portions of I-30 and I-35E across the Trinity River along with the interconnecting roadway sections and ramps. The existing infrastructure is outdated functionally and rapidly deteriorating structurally. Due to its
Poster 2014 CTR Symp: Khwaja Mobility Planning
Full-text Link:
No online resource supplied by researcher
______________________________________________________________________________________________________
Construction, 2014
13.
2014 ... [various authors] · "TRR No. 2408 consists of 12 papers that cover performance bonds; alternative technical concepts; indefinite delivery-indefinite quantity contracting; geotechnical requirements in the design-build selection process; visualization technology; and air content stability in the slipform paving process. This issue also
TRR 2408 ... TRR 2408; TRR 2408 ... Transportation Research Record (TRR), 2408
Full-text Link:
Ask librarian for assistance.
______________________________________________________________________________________________________
Small Business Inclusion: A Study of TxDOT’s Consultant Procurement Program
14.
2013 ... Khali R. Persad [and four others] · The Texas Department of Transportation (TxDOT) sought the services of a public institution of higher education to conduct a study of TxDOT’s professional services contracting program through an Interagency Contract (IAC). The Request for Proposal (RFP) stated that it had come to
Persad 2013 [CTR] ... IAC 48-2XXIA001
Full-text Link:
http://library.ctr.utexas.edu/ctr-publications/iac/48-2XXIA001.pdf
2.6 MB
______________________________________________________________________________________________________
Assessment of TxDOT Staffing for Project Development and Construction, and Project Backlog Analysis
15.
2013 ... Khali R. Persad [and four others] · The objective of the work documented in this report was to examine full-time-equivalent (FTE) staffing needs for TxDOT project development and construction, and analyze needs for backlogging projects, i.e., preparing construction plans in advance and keeping them at the ready for possible
6581-CT-5 [CTR] ... FHWA/TX-13/0-6581-CT-5
Full-text Link:
http://library.ctr.utexas.edu/ctr-publications/0-6581-CT-5.pdf
3.8 MB
______________________________________________________________________________________________________
RTI Special Studies for TxDOT Administration in FY 2012
16.
2013 ... Khali Persad [and four others] · This research project was established by TxDOT’s Research and Technology Implementation Office to address special studies required by the department’s Administration during FY 2012. Three tasks were completed and are documented. · CONTENTS: Chapter 1. Introduction -- Chapter 2.
6581-CT-4 [CTR] ... FHWA/TX-13/0-6581-CT-4
Full-text Link:
http://library.ctr.utexas.edu/ctr-publications/0-6581-CT-4.pdf
3.6 MB
______________________________________________________________________________________________________
How Visualization Technology Can Help Improve Transparency of the Department of Transportation Design and Construction Projects
17.
2013 ... Nabeel Khwaja and Cameron Schmeits · Reconstruction of major urban highway projects need to balance the mobility needs of the driving public and construction needs of the contractor. This is generally accomplished through the development of the detailed Traffic Control Plans (TCP). However, the presentation of
Poster 2013 CTR Symp: Khwaja
Full-text Link:
http://library.ctr.utexas.edu/symposium/poster-session/2013/abstracts/2013-schmeits.pdf
3.7 MB
______________________________________________________________________________________________________
3D-4D Modeling of North Tarrant Express Project
18.
2013 ... Nabeel Khwaja, P.E. [and four others] · Two projects are presented showing their use of 3D and 4D models for multiple purposes: Public information about closures due to construction activities, schedule visualization to support multiple stakeholders inside and outside of TxDOT, and support for planning and construction activities.
Poster 2013 CTR Symp: Schmeits
Full-text Link:
http://library.ctr.utexas.edu/symposium/poster-session/2013/abstracts/poster-mandali.pdf
______________________________________________________________________________________________________
Construction 2012
19.
2012 ... [various authors] · This issue contains 14 papers on the subject of construction as related to transportation. Specific topics discussed in the papers fall within the following categories: construction management and project delivery; quality assurance; portland cement concrete pavements; asphalt pavements; and steel
TRR 2268 ... TRR 2268 ... Transportation Research Record (TRR), 2268
Full-text Link:
Ask librarian for assistance.
______________________________________________________________________________________________________
RTI Special Studies for TxDOT Administration in FY 2011
20.
2012 ... Khali R. Persad [and five others] · This research project was established by TxDOT’s Research and Technology Implementation Office to address special studies required by the department’s Administration during FY 2011. Three short-term, quick-turnaround tasks were completed and are documented. The following three tasks
6581-CT-3 [CTR] ... FHWA/TX-11/0-6581-CT-3
Full-text Link:
http://ctr.utexas.edu/wp-content/uploads/pubs/0_6581_CT_3.pdf
2.1 MB
______________________________________________________________________________________________________
Four-Dimensional Modeling for TxDOT Dallas District
21.
2011 ... Nabeel Khwaja, William O'Brien, Cameron Schmeits, Jean Goyat, Kristopher Pruner · 3D/4D modeling has been adopted for use in the building construction industry relatively quickly, however, its use in highway construction has been limited at best. Center for Transportation Research has been using 3D/4D modeling on
Poster 2011 CTR Symp: Khwaja
Full-text Link:
http://library.ctr.utexas.edu/symposium/poster-session/2011/presenters/Poster_Khwaja.pdf
313 KB
______________________________________________________________________________________________________
Implementing a Project and Portfolio Management System for TxDOT Project Development
22.
2011 ... Nabeel Khwaja · "Beginning in the summer of 2009, Texas Department of Transportation (TxDOT) started developing the framework for implementing a sophisticated new system to manage its large and diverse portfolio of projects during their development phase. This was followed by the implementation itself for managing
9012-01-1 [CTR] ... 9-9012-01-1
Full-text Link:
http://ctr.utexas.edu/wp-content/uploads/pubs/9_9012_01_1.pdf
928 KB
______________________________________________________________________________________________________
Synthesis of Innovative Contracting Strategies Used for Routine and Preventive Maintenance Contracts
23.
2010 ... Cindy L. Menches, Nabeel Khwaja, Juan Chen · This document can be used by Maintenance Division and district personnel at all levels to encourage implementation of innovative methods for outsourcing more extensive maintenance activities within TxDOT. These research objectives were accomplished through the following research
6388-P1 [CTR] ... Product 0-6388-P1
Full-text Link:
http://ctr.utexas.edu/wp-content/uploads/pubs/0_6388_P1.pdf
1.3 MB
______________________________________________________________________________________________________
Synthesis of Innovative Contracting Strategies for Routine and Preventive Maintenance Contracts
24.
2010 ... Cindy L. Menches, Nabeel Khwaja, Juan Chen · TxDOT is faced with a need to expand their maintenance contracted services due to shortage of in-house personnel and expertise. As a result, TxDOT had a need to investigate maintenance contracting strategies to identify those efficient strategies that might be implemented to
6388-1 [CTR] ... FHWA/TX-10/0-6388-1
Full-text Link:
http://ctr.utexas.edu/wp-content/uploads/pubs/0_6388_1.pdf
1.6 MB
______________________________________________________________________________________________________
Synthesis Study on Innovative Contract Techniques for Routine and Preventive Maintenance Contracts
25.
2009 ... Cindy L. Menches, Juan Chen and Nabeel Khwaja · For the past decades, shortages of in-house resources -- including expertise, equipment, and experienced personnel -- have caused many state highway agencies to outsource a significant amount of their maintenance work. Some states have experimented with
6388 Summary [CTR] ... PSR 0-6388 ... Project Summary Report, 0-6388
Full-text Link:
http://library.ctr.utexas.edu/hostedpdfs/txdot/psr/6388.pdf
______________________________________________________________________________________________________
New Search

Made possible by the generous support of the
Texas Department of Transportation Research and Technology Implementation Office (RTI)


Center for Transportation Research | Cockrell School of Engineering | The University of Texas at Austin

©2015 Center for Transportation Research | Web Accessibility Policy | Web Privacy Policy


Powered by Inmagic (www.inmagic.com)