TxDOT Research Project

Development of Integral/Semi-integral Abutments for TxDOT Bridges

Project Summary
While the use of integral and semi-integral bridge abutments has reportedly been increasing nationwide, their construction in Texas has remained limited. These systems have been reported to minimize the costs associated with the installation, maintenance, and repair of bridge deck joints and bearings. In addition, they have the potential to minimize the "bump at the end of the bridge,” which results in reduced maintenance costs. Although this technology has not been widely adopted in Texas, a reassessment of its potential cost and performance benefits is timely. This requires assessment of key design and construction aspects, including the characteristics of common soils in Texas, the details typically adopted for foundation, superstructure, and substructure, and the local pavement standards. Accordingly, this project proposes to assess the use of this technology in Texas by producing: (1) a review of US and international practices, as well as of existing data, to assess the applicability to conditions prevailing in Texas, (2) a thorough evaluation of structures already constructed in Texas, as well as of an integral bridge that will be constructed in 2016 in Texas by FHWA Federal Lands, and (3) a set of design details for using this technology in Texas conditions.

Project Number
0-6936
Status
Completed

link icon Copy link to this project.

Start Date
9/1/2016
End Date
12/31/2023
Performing Institution(s)
Center for Transportation Research (CTR)
Research Team
RS: Jorge Zornberg
Sponsor
Project Manager
Jade Adediwura
Contract Specialist
Tiki Smith
TxDOT Advisor
Blanca Pattee, BRG
Michael Hyzak, BRG
Leon Flournoy, BRG
Doug Beer, BRG
Dina Dewane, BRG
Sean Yoon, BRG
Kathleen Newton, AUS
Amount Funded
$1,049,627
Notes
2018 Webinar Presentation available at https://ftp.dot.state.tx.us/pub/txdot-info/brg/webinars/2018-0913/05.pdf
Source
TxDOT RTI
Page:
Publications Note
For "Active" or recently completed projects without publications, please contact the Research Supervisor (RS) listed in Project Details if information is needed about the status of research findings.
Functional Area
Structures and Hydraulics
Index Terms
Bridge abutments
Bridge design
Bridges
Lead University
CTR
Researcher
Zornberg, Jorge G.
TxDOT District
BRG
AUS

Registered users may add comments. Comments will be shown with usernames.

Comments
nugentml
nugentml
Related content: This project and other related projects are referred to in web presentation "Seamless Bridges" (9/13/2018) / Michael Hyzak, P.E. http://ftp.dot.state.tx.us/pub/txdot-info/brg/webinars/2018-0913/05.pdf
4/24/2020 at 4:40 PM
0
Record Added:
2/14/2017
Record Updated:
2/6/2024 9:31 AM EST

Report a broken link or error ».

Made possible by the generous support of the
Texas Department of Transportation Research and Technology Implementation Division (RTI)


Center for Transportation Research | Cockrell School of Engineering | The University of Texas at Austin

©2024 Center for Transportation Research | Web Accessibility Policy | Web Privacy Policy